National

Mumbai: 2 Dead, Over 70 Covid Patients Evacuated As Fire Breaks Out At Hospital

A Level 4 fire had broken out at Dreams Mall Sunrise Hospital, which is on the third floor of the mall.

Advertisement

Mumbai: 2 Dead, Over 70 Covid Patients Evacuated As Fire Breaks Out At Hospital
info_icon

A massive fire broke out at a private Covid-19 hospital in Mumbai’s Bhanup area in the early hours of Friday. At least two people have died in the fire, officials said. As many as 76 Covid-19 patients were admitted to the Dreams Mall Sunrise Hospital.

The fire broke out at the Dreams Mall Sunrise Hospital in Bhandup area shortly after midnight, the official said.

The hospital is situated on the third floor of the five-storeyed mall building and many patients including those being treated for Covid-19 were at the hospital when the fire broke out, the official said.

The incident comes amid an upsurge in coronavirus cases in Mumbai. On Thursday, the city logged 5,504 new infections, the highest daily count since the pandemic began.

Advertisement

Around 22 fire tenders reached the hospital to douse the flames, officials said. The cause of the incident is not yet known; a probe has been launched.

The police official said two patients had died in the blaze, but a BMC control room official said there was confirmation of only one fatality so far.

The cause of the 'level four' fire (serious emergency call in fire brigade parlance) has not been ascertained yet, the control room sources said.

Around 20 fire engines, 15 water tankers and ambulances were rushed to the spot. Fire fighting operation is underway, the official said.

Patients were evacuated by the fire brigade and shifted to another hospital, the official said, adding fire personnel are checking if any patient is still stuck in the hospital.

Advertisement

Mumbai Mayor Kishori Pednekar who visited the site expressed surprise that a hospital was operating inside the mall.

"I have seen a hospital at a mall for the first time," the mayor said, adding action will be taken if irregularities were found in allowing the facility to operate there.

With PTI inputs

Advertisement