Delhi Metro First Phase

Delhi Metro First Phase
info_icon
Benefits
  • By 2005, it will carry 22 lakh passengers a day
  • Will considerably reduce city’s air and noise pollution. An estimated Rs 500 crore will be saved on fuel per year.
  • Once fully operational, trains will ply every three minutes
  • Shahdara to Tis Hazari in just 13 minutes. Will save 26 lakh manhours per day.

Safety

  • Anti-collision devices and emergency exit
  • Separate Metro police to maintain law and order. Will also be equipped to deal with terrorist threat.
  • Power back-up facility at both stations and on trains
  • Wireless passenger-driver communication system.

Technology

  • Comfortable and safe travel, among the world’s best
  • Contact-free automatic fare collection
  • Fully air-conditioned coaches with fire-resistant interiors
  • Heavy-duty escalators at all stations with emergency stop buttons and sari guards
  • Metro trains and stations will be friendly to the physically challenged and visually impaired
  • Automatic doors with sensors to facilitate entry and exit. Train will move only when doors are closed.
  • Public address system at stations and on trains.
  • Fire-resistant coaches with emergency exit.

Fare Table: Shahdara-Tis Hazari

Tariff in Rupees Shahdara Welcome Seelampur Shastri Park ISBT Tis Hazari
Shahdara - 4.00 5.00 6.00 7.00 7.00
Welcome 4.00 - 4. 00 5.00 6.00 7.00
Seelampur 5.00 4.00 - 4.00 5.00 6.00
Shastri Park 6.00 5.00 4.00 - 5.00 5.00
ISBT 7.00 6.00 5.00 5.00 - 4.00
Tis Hazari 7.00 7.00 6.00 5.00 4.00 -

Section Km. Target
Tis Hazari-Tri Nagar 4. 5 Sep 2003
Tri Nagar-Rithala 8.5 Mar 2004
Delhi Univ.-ISBT 4.0 Dec 2004
Rithala-Barwala 6.1 Mar 2005
Barakhamba Rd.-Kirti Ngr. 8.3 Jun 2005
ISBT-Central Sec. 7.0 Sep 2005
Kirti Nagar-Dwarka 14.8 Sep 2005
Published At:
Tags
×