9with
The Rs 6,957-crore project includes a 34.5-km elevated corridor and four-laning of NH-37 to ensure safe animal movement and reduce road accidents.
The corridor, to be built by NHIDCL within 36 months, will allow wildlife to move between the national park and Karbi Anglong Hills, especially during floods.
