Inside A Dark Tunnel

Updated on:
Published at:

Inside A Dark Tunnel
  • Flights delayed: 210 (domestic and international).
  • Trains delayed: 250. Only five per cent trains (out of an estimated 120 operating out of Delhi) running on schedule.
  • Rs 300,000,000,000 needed to modernise 60,000-km long railways network.
  • Deal with Raytheon in ‘94 to instal navigation systems for Delhi’s domestic and international airports. But the systems don’t work when visibility is below 350 metres.
  • Most aircraft in India not compatible with the advanced landing system. Pilots not trained for such conditions.
  • Read all the latest breaking news on Outlook India and stay updated with top stories from India, Entertainment, Education, and around the world.

    Tags

      • image
      • image
      • image
      ×

      Latest Sports News

      Trending Stories

      Latest Stories